Removing an installed turbine package from inside a natural gas facility is a substantial undertaking. Recovering its resale value requires careful planning, coordinated field execution and close attention to the plant systems and building around it.
Every stage matters: disconnecting the equipment, creating an extraction route, coordinating heavy
equipment movement and restoring the building once the work is complete.
At a natural gas facility in northwestern Alberta, Black Iron Energy brought commercial expertise and field
capability together to deliver exactly that.
The sale and removal of a Solar Turbines Mars 100 gas turbine and compressor package helped the owner
recover value, avoid substantial removal costs and reclaim usable building space. The customer was immensely
impressed with the quality of the work and the finished result.
Turning a Surplus Asset into an Opportunity
“Our role was to bring the equipment transaction and the field execution together. That meant understanding the commercial opportunity, planning how the package would come out and coordinating the work to deliver the results the customer needed.”
Darren McRae, Business Development Manager
Planning Around an Operating Facility
The scope reached well beyond the turbine itself. Each connected system had to be accounted for before the package could be moved.
The compressor skid, fuel gas and seal gas systems, oil cooler, air intake equipment, electrical connections and associated piping all had to be addressed as part of the removal sequence.
Black Iron began with a site inspection to define the work, then coordinated with plant personnel and specialist contractors to prepare for execution.
That included:
- Verifying equipment isolation and electrical disconnection with the facility team.
- Planning the sequence of mechanical and electrical work.
- Preparing building access for equipment extraction.
- Coordinating lifting, jacking, loading and transportation activities.
The removal sequence had to account for both the equipment being extracted and the facility surrounding it. Close coordination with plant personnel helped the team complete the work without causing an unplanned shutdown.
A Carefully Controlled Extraction
One of the project’s most demanding technical challenges was establishing a controlled route from the equipment’s installed position to the transportation trailers. The extraction required careful preparation and close coordination between the crews preparing the equipment and the specialist jacking and hauling contractor.
Crews temporarily removed a section of the building wall and disconnected auxiliary systems to provide access. The turbine and compressor skids were released from their foundations and prepared for a jack-and-slide extraction.
Using jacks and skates, the equipment was carefully moved toward the wall opening for extraction and loading. Black Iron coordinated equipment preparation with the specialist contractor throughout the load-out. Once the equipment was removed, the wall was repaired with a seamless finish, completing the work with the same attention to detail applied to the extraction.
Results That Went Beyond the Sale
The project delivered several connected benefits for the equipment owner:
- A return from the surplus asset: The turbine package was sold rather than left occupying space onsite.
- $325,000 CAD in removal costs avoided: The transaction addressed a significant future expense.
- Additional usable building space: Removing the package achieved the owner’s secondary goal of reclaiming room within the facility.
- A restored building: The wall was repaired following extraction, leaving a seamless finish.
- Material and equipment recovery: Resale, reuse, redeployment and recycling helped retain value from the removed assets.
The Capability to See It Through
For operators managing surplus equipment, a successful sale depends on more than finding a buyer. Disconnection, site access, operational requirements and restoration all influence whether an opportunity delivers its full value.
Black Iron brought those elements together on this project, delivering a return on a surplus asset, $325,000 CAD in removal costs avoided and reclaimed building space. Just as importantly, the quality of the execution and the restored building left the customer immensely impressed.
This was a substantial undertaking, and the finished result reflected the planning, coordination and workmanship behind it. For Black Iron, seeing the project through meant delivering work the team could be proud of and a result the customer valued.